Corcoran ASC & Imaging Center
Developer: GL Bruno Associates
Gateway Engineering, Inc. was responsible for boundary and
topographic surveys, lot line adjustment for vacation of street
rights-of-way, assistance with preparation of the site plan, and
site improvement construction plans. Because of the roadway
vacation, a storm water lift station was designed to maintain
drainage for approximately eight acres of existing residential and
commercial land. Construction
is scheduled to begin by September 2009 and Gateway Engineering will
be providing construction staking services.
|
![]() |